The BG-RAIL sunk cable trough is used in railway stations and along railway lines to supply all electrical installations, signal and energy supply as well as telecommunication cables. The solid cover also acts as a path. All cable troughs are manufactured with “premarked” 5 mm cutting lines. These allow a precise mitre cut of 22,5° or 15° to be created on site in seconds. This makes installation in different radii possible and allows obstacles to be “bypassed”.Technical data
Disponibilità Regionale
Europa | Asia | Nord America | Africa |
---|---|---|---|
Albania | Emirati Arabi Uniti | Canada | Egitto |
Andorra | India | Stati Uniti | |
Austria | Qatar | ||
Belgio | |||
Bielorussia | |||
Bosnia ed Erzegovina | |||
Bulgaria | |||
Cipro | |||
Città del Vaticano | |||
Croazia | |||
Danimarca | |||
Estonia | |||
Finlandia | |||
Francia | |||
Germania | |||
Gibilterra | |||
Grecia | |||
Guernsey | |||
Irlanda | |||
Islanda | |||
Isola di Man | |||
Isole Åland | |||
Isole Faroe | |||
Italia | |||
Jersey | |||
Lettonia | |||
Liechtenstein | |||
Lituania | |||
Lussemburgo | |||
Macedonia del Nord | |||
Malta | |||
Moldavia | |||
Monaco | |||
Montenegro | |||
Norvegia | |||
Paesi Bassi | |||
Polonia | |||
Portogallo | |||
Regno Unito | |||
Repubblica Ceca | |||
Romania | |||
San Marino | |||
Serbia | |||
Slovacchia | |||
Slovenia | |||
Spagna | |||
Svalbard e Jan Mayen | |||
Svezia | |||
Svizzera | |||
Ucraina | |||
Ungheria |